HARD SPOT INSPECTION TROLLEY - English -
Page 84/84
Operating and Maintenance Instructions
adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3
Hard spot inspection trolley • PLAMAT-M •
18201 |
|
Operating and
Maintenance Instructions • V2.0 |
List of tables
|
LIST
OF TABLES
Table
|
Description
|
Page No.
|
1
|
Structure of the trolley (1)
|
20
|
2
|
Structure of the trolley (2)
|
21
|
3
|
Inspection unit
|
23
|
4
|
Battery housing
|
25
|
5
|
Battery storage station
|
28
|
6
|
Elements on front panel
|
29
|
7
|
Elements on back panel
|
29
|
8
|
Chalk marking unit
|
30
|
9
|
Pre- and post-processing
|
38
|
10
|
Elements on the Inspection tab (1)
|
39
|
11
|
Elements on the Inspection tab (2)
|
40
|
12
|
Elements of the Measurement and calibration tab
|
45
|
13
|
Elements of GUI Temperature compensation
| 75
|
14
|
Spare parts list
|
81
|
15
|
Maintenance and cleaning intervals |
82
|
ROSEN and IZfP Page 83 of
84 |
Confidential! |
|