NASA CP Basic Principles Book
Indice ROCarneval

HARD SPOT INSPECTION TROLLEY - English - Page 28/84

Operating and Maintenance Instructions

adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3


Hard spot inspection trolley • PLAMAT-M • 18201
Operating and Maintenance Instructions • V2.0
Structure and handling of the trolley


3.4 Battery storage station

The system comes with a separate station for storing up to three batteries during the charging process. The station comprises a rigid and robust aluminum frame. Two band of rolls per storage spot help to drag the battery from the trolley onto the station. Adjustable feet allow to align the station and trolley in height. Fittings for fixing the storage frame to the ground are provided, corresponding screws are not included.

Battery storage station 1
Battery storage station 2
Figure 24: Battery storage station

Table 5: Batteruy storage station
Pos.
Description
 1  Battery housing
 2  Adjustable foot
 3  Fixing plate
 4  Roller track
 5  Retaining plate




ROSEN and IZfP Page 28 of 84 Confidential!



indice
p�gina atual em ingl�s
proxima pagina portugu�s
index
p�gina atual em portugu�s
p�gina seguinte em ingl�s