HARD SPOT INSPECTION TROLLEY - English -
Page 38/84
Operating and Maintenance Instructions
adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3
Hard spot inspection trolley • PLAMAT-M •
18201 |
|
Operating and
Maintenance Instructions • V2.0 |
Software 3MA-X8 MMS
|
4.3 Pre- and post-processing
Pre-processing:
- Power up electronic
- Start tablet PC
- Start software
- Load configuration file
- Run measurement
Post-processing:
- Stop measurement
- Save configuration file
- Close software
- Power down electronic
Figure 37: Running and stopping the measurement
Table 9: Pre-and post-processing
Pos.
|
Description
|
1
|
Start measurement
|
2
|
Stop measurement
|
ROSEN and IZfP Page 38 of
84 |
Confidential! |
|