HARD SPOT INSPECTION TROLLEY - English -
Page 53/84
Operating and Maintenance Instructions
adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3
Hard spot inspection trolley • PLAMAT-M •
18201 |
|
Operating and
Maintenance Instructions • V2.0 |
Software 3MA-X8 MMS
|
4.7.3 Calibration settings
The frame consists of two panels:
Figure 53: Calibration settings
Changing parameters after calibration:
Figure 54: Changed parameters after calibration
ROSEN and IZfP Page 53 of
84 |
Confidential! |
|