HARD SPOT INSPECTION TROLLEY - English -
Page 42/84
Operating and Maintenance Instructions
adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3
Hard spot inspection trolley • PLAMAT-M •
18201 |
|
Operating and
Maintenance Instructions • V2.0 |
Software 3MA-X8 MMS
|
4.4.3 Creating a report (example)
Pos.
|
Description
|
1
|
Add new mapping trace
|
2
|
First trace
|
3
|
Enter trace gap (default sensor width 240 mm)
|
Pos.
|
Description
|
1
|
Second trace
|
Pos.
|
Description
|
1
|
Third trace
|
Pos.
|
Description
|
1
|
Fourth trace
|
2
|
After measurement of last trace => Create report
|
ROSEN and IZfP Page 42 of
84 |
Confidential! |
|