HARD SPOT INSPECTION TROLLEY - English -
Page 34/84
Operating and Maintenance Instructions
adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3
Hard spot inspection trolley • PLAMAT-M •
18201 |
|
Operating and
Maintenance Instructions • V2.0 |
Structure and handling of the trolley
|
3.14 Exchanging the
vertical rail system
NOTICE
|
! Damage of wire connections!
Disconnect all plugs before removing the inspection unit.
|
The following figures show the exchange of the vertical rail system:
Figure 33: Removing the vertical rail system
ROSEN and IZfP Page 34 of
84 |
Confidential! |
|