NASA CP Basic Principles Book
Indice ROCarneval

HARD SPOT INSPECTION TROLLEY - English - Page 34/84

Operating and Maintenance Instructions

adaptaed from: https://app.box.com/s/c6qfgtuhfg1yd2ottrfum98x8jmg7rn3


Hard spot inspection trolley • PLAMAT-M • 18201
Operating and Maintenance Instructions • V2.0
Structure and handling of the trolley


3.14 Exchanging the vertical rail system

NOTICE
  ! Damage of wire connections!
Disconnect all plugs before removing the inspection unit.


The following figures show the exchange of the vertical rail system:


remove the vertical rail system 1remove the vertical rail system 2
remove the vertical rail system 3remove the vertical rail system 4
Figure 33: Removing the vertical rail system






ROSEN and IZfP Page 34 of 84 Confidential!



indice
página atual em inglês
proxima pagina português
index
página atual em português
página seguinte em inglês